© 2014 313_Q - 02/1411. Location2. Install Junction Box3. Size TransformerORZone1234Thermostat LoadZone Valve LoadControl Load (VA)Total Zone Load+
© 2014 313_Q - 02/1426. Low Voltage WiringRCLNORORRCExpansiontN4CtN4tN4CXExpansionXEnd SwitchtN4CXExpansionXEnd SwitchTTDemandBoilertN4CXXCRZone Val
38. Install The Cover7. Two-Stage ThermostatsZone 1 Zone 2 Zone 3 Zone 4tN2 tN2 tN2 tN2 tN2 tN2 tN2 tN2Two-Stage Terminal DesignationZone 1 Zone 3Stag
© 2014 313_Q - 02/1441. Emplacement 2. Installez la boîte de jonction3. Transformateur de taille4. Filage ligne tensionOUZone 1 2 3 4Charge de therm
56. Filage basse tension8. Installez le couvercle7. Thermostats bi-étagéZone 1 Zone 2 Zone 3 Zone 4tN2 tN2 tN2 tN2 tN2 tN2 tN2 tN2Inscription sur la t
© 2014 313_Q - 02/146OZona 1 2 3 4Carga del termostatoCarga de la válvula de zonaCarga de control (VA)Carga total de la zona + + + +3El transformad
© 2014 313_Q - 02/147Power Source (L, N, Ground)Zone Group Pump (L, N, Ground)(red)313Strip wires 1/2 inch (13 mm).Installed wires are not removable
8Zone 1 Zone 2 Zone 3 Zone 4tN2 tN2 tN2 tN2 tN2 tN2 tN2 tN2Designación de una terminal de dos etapasZona 1 Zona 3Etapa 1 Etapa 2 Etapa 1 Etapa 2Zona 1
Kommentare zu diesen Handbüchern